Close call. Figure 02 and Honey Badger 5.0 trade wins across the matrix.
Readiness, uptime, navigation & connectivity
Price accessibility and ROI clarity
Payload, speed, runtime & labor replacement
Environment fit, footprint & long-term upside
Sheet-metal loading in automotive assembly — 2-second cycle precision on BMW X3 production line, 90,000+ parts handled in 11-month pilot
Municipal sewer inspection in flooded or submerged sections where 100 m of umbilical reach is sufficient.
Both are credible picks. Decide on cost and supplier proximity, not capability — the gap is small.